The following are some of the major contract works undertaken:  -

  1. Construction factory lot no. 2431 at Port Diskson, Negeri Sembilan

                                    Client: Perkasa Sutera Sdn Bhd                                 -  RM11.2 million

  1. Supply, delivery, installation and commission of equipment controls for up-grading the chemical handling and dosing system at Loji Air Bandar Baru Sri Iskandar, Perak

                                     Client: Transwater Engineering Sdn. Bhd.                  -  RM 1.0 million

  1. Electrical and associated work for Bukit Bauk Water Treatment Plant 2

                                     Client: Sulong Engineering Sdn Bhd                           -  RM 1.8 million

  1. Construction , completion , testing & commission of mechanical work at Bukit Bauk Water Treatment Plant 2

                                     Client: Syarikat Pembinaan Lai Siew Keong Sdn Bhd  - RM 8.7 million

  1. Supply, delivery, installation and commission of equipment controls and instrumentation for up-grading the chemical handling and dosing system at the Sg. Dua Treatment Plant

                                     Client: Transwater Engineering Sdn. Bhd.                  -  RM 2.8 million

  1. Construction, completion and maintenance of pumphouse reservior, suction tank and ancillary works for 3000 quarters for K L I A

                                     Client: Negara Properties Builders Sdn. Bhd.             -  RM 2.4 million

  1. Pakej No : TR 01 – S6, Construction of intake structure and pump house at Kg. Besut, Setiu, Terengganu Darul Iman

                                     Client: Pengarah J B A Terengganu                          -  RM 1.8 million

  1. Rehabilitation of original scope of work and installation of Phase I & II pumps for various Johor W.T.P.

                                     Client: Southern Water Corporation                           -  RM 4.1 million

  1. Refurbishment of Johor 14 Water Treatment Plants

                                     Client: Southern Water Tech./Musteq Fluids JV          - RM 4.9 million

  1. Rehabilitation Works For Water Treatment Plant In Selangor

                                     Client:  C.G.E. Utilities (M) Sdn Bhd                         -  RM 2.2 million

  1. Replacement of 800 mm, 600 mm and 400 mm Ø mild steel pipes and fittings for Parit Raja and   Yong Peng II.

                                     Client: Southern Water Corporation Sdn Bhd              -  RM 1.0 million

  1. 2nd Rehabilitation of Johor 14 Water Treatment Plants

                                     Client: Southern Water Corporation Sdn Bhd              -  RM 2.0 million

  1. Refurbishment of Mentakab Treatment Works In Pahang           

                                     Client: Jabatan Bekalan Air Negeri Pahang                -  RM 2.3 million

  1. Design, rehabilitation, supply and commission dual media Filtration system for Sg. Linggi Water Treatment Plant      

                                     Client: Jabatan Bekalan Air Negeri Sembilan              - RM 1.4 million

  1. Supply, construction and commission of Treatment and Pumping  Plant for FELDA Nitar scheme

                                           Client: FELDA Negeri Johor                                     -  RM 0.7 million

  1. Rehabilitation and convert to slow sand filter system for Sg. Tapah Treatment Plant

                                     Client: Lembaga Air Perak                                        - RM 0.6 million

  1. Conversion of A.C. Perforated Laterals to Under Drainage type filters

                                     Client: Jabatan Bekalan Air Selangor                          - RM 0.5 million

  1. Supply and deliver of filter media for all Water Treatment Plant In Selangor for 2 years     

                                     Client: Jabatan Bekalan Air Selangor                          - RM 0.6 million  

   

For a list of completed projects, please click here.